E+I Engineering have a proven track record in consistently delivering projects to the highest of standards. We boast a varied portfolio of successfully completed projects across the globe, specialising in mission critical power distribution for industries such as Data Centres, healthcare, industrial and Transport. With 30 years experience in the field, our team provide specialist technical services, unrivaled customer support and project management throughout the entire project.
View All Case Studies
Powerbar Gulf installed Cast Resin Powerbar, an IP68-rated, maintenance-free busbar system for use in outdoor, hazardous or life safety applications. Designed to withstand hostile environments
View Case StudyE+I Engineering worked in conjunction with Laing O’Rourke to deliver an integrated power distribution system as part of the £1 billion Manchester Airport transformation programme, commissioned to meet the increased demand for international and domestic travel at the UK’s third largest airport.
View Case StudyE+I Engineering worked in collaboration with Kirby Engineering, Collen Construction and Callaghan Engineering to deliver 24 modular LV switchrooms complete with busbar containment, UPS, STS and communications equipment in addition to all small power and distribution for a 60MW hyperscale data centre for a confidential client in Dublin.
View Case StudyE+I Engineering were commissioned to engineer a complete power distribution and monitoring system for the first construction phase of Northern Irelands first carrier neutral Tier III colocation data centre.
View Case StudyE+I Engineering were appointed as the LV panel supplier for Liverpool Football Clubs brand new training facility. The 9,200 square metre centre in Kirkby, was developed to bring both the Liverpool first-team and the club’s Academy talent together in one central training facility.
View Case StudyE+I Engineering worked in association with Bancroft on the replacement of an existing ten panel 11kV MV switchboard, as well as an interface with a new ten panel board.
View Case StudyE+I Engineering were specified to design and manufacture an open track busway system to power the Data Center expansion at Texas A&M University. The 50,000 sq. ft facility with 30,000 sq. ft for computing was commissioned to meet the growing needs of the campus which experiences over 45TB of data transfer across the campus network each day during the spring and fall semesters.
View Case Study